1992 VIEW OF MILL FROM UPPER TAILINGS POND (NORTH). ROASTER ON LEFT WITH ELEVATOR/CRUSHED ORE BIN TOWER TO RIGHT. MAIN MILL BUILDING IN CENTER WITH THICKENER ADDITION TO RIGHT. MACHINE SHOP ON CRUDE ORE BIN TERRACE ABOVE ROASTER. THE LOCATION OF THE 100,000 GALLON MILL WATER TANK CAN BE SEEN AT THE CENTER RIGHT NEAR THE TOP OF THE MOUNTAIN
1992 VIEW OF MILL FROM WEST. SECONDARY THICKENER No. 7 JOISTS AND CENTRAL MECHANISM IN FOREGROUND
1992 VIEW OF DUST COLLECTOR AND CRUSHED OXIDIZED ORE BIN FROM EAST. THE DUCTWORK TO TOP OF COLLECTOR (OPEN END, MIDDLE LEFT) CONNECTED TO HOODS OVER SYMONS SCREEN, ROD MILL, AND BAKER COOLER DISCHARGE
1992 VIEW OF MILLING FLOOR FROM SOUTHEAST. SECONDARY MILL AND CLASSIFIER AT MIDDLE LEFT. PRIMARY MILL SURGE TANK AND LAUNDERS AT MIDDLE BOTTOM. STAIR TO TROJAN CLASSIFIER LEVEL BEHIND CRANE BENT, UPPER RIGHT. PAIRED PIPES FROM PRIMARY PULP PUMPS TO PRIMARY THICKENERS RISE VERTICALLY AT MIDDLE RIGHT AND RUN HORIZONTALLY ACROSS TOP OF VIEW
1992 PORTLAND FILTER FLOOR FROM SOUTHEAST. CYANIDE FEED TOWER TO SUMP, LOWER RIGHT QUADRANT. DIAGONAL PIPE IN UPPER RIGHT IS AIR LINE TO AGITATORS. LAUNDER PARALLEL TO LEFT EDGE (FILLED WITH DEBRIS) RUNS FROM PRIMARY THICKENER No. 2 TO GOLD TANK No. 2
1992 PORTLAND HOISTHOUSE, TRAM SNOWSHED OUTSIDE PORTAL WITH TWIN SIDE CABLE ROLLER