1992 VIEW FROM SOUTHWEST TO CORNER WHERE SAMPLING/CRUSHING ADDITIONS ABUT CRUSHED OXIDIZED ORE BIN. INTACT BARREN SOLUTION TANK VISIBLE IN FRONT OF CRUSHED ORE BIN.
1992 DETAIL OF WALL. BEHIND WALL FRAMING IS SAMPLING ROOM WITH WOOD SAMPLING ELEVATOR. CRUSHED OXIDIZED ORE BIN ON LEFT (SOUTH).
1992 VIEW OF WEST WALL OF CRUSHING ADDITION FROM SOUTHWEST. STEPHENS-ADAMSON 25 TON/HR BUCKET ELEVATOR IN CENTER. TEAM SUPERVISOR ROBERT W. GRZYWACZ ON LOWER LEVEL (LOCATION OF STEARNS-ROGER DRYER).
1992 VIEW FROM CRUSHED OXIDIZED ORE BIN WEST TO THICKENER ADDITIONS. SHAFT OF PRIMARY THICKENER No. 1 AT CENTER, WITH PRIMARY THICKENER No. 2 ABOVE AND TO THE LEFT. INTACT THICKENER SURGE TANK IS JUST ABOVE AND TO THE RIGHT (NORTH). ALL FRAMING ABOVE SECONDARY THICKENERS No. 2, No. 3, AND No. 7 HAS COLLAPSED.
1992 VIEW OF SOUTH WALL OF THICKENER ADDITIONS. BARREN SOLUTION TANK IN FOREGROUND.
1992 VIEW OF FRAMING BENT BETWEEN SECONDARY THICKENER No. 3 AND PRIMARY THICKENER No. 2 FROM WEST. NOTE MECHANISM ON PRIMARY No. 2 ON LEFT, BARREN SOLUTION FEED PIPE AT LOWER RIGHT.