1992 VIEW NORTH FROM EAST CRUDE ORE BIN TO CRUSHER ADDITION AND CRUSHED OXIDIZED ORE BIN. VISIBLE ARE DINGS MAGNETIC PULLEY (CENTER), THE 100-TON STEEL CRUSHED UNOXIDIZED ORE BIN, AND UPPER PORTION OF THE STEPHENS-ADAMSON 25 TON/HR BUCKET ELEVATOR. THE UPPER TAILINGS POND LIES BEYOND THE MILL WITH THE UPPER TAILINGS DAM UNDER THE GRAVEL ROAD IN THE UPPER RIGHT CORNER.
1992 VIEW OF CRUSHER ROOM FROM NORTH. THE CRUSHER IS MISSING, BUT THREE GRIZZLIES AND THE FEED GATE FROM THE SOUTH ORE BIN ARE STILL VISIBLE. PULLEY AT BOTTOM OF THE VIEW IS THE BEGINNING OF THE 24 INCH BELT CONVEYOR
1992 VIEW OF CRUSHER ROOM FROM NORTH. NOTE CRUDE ORE BIN FRAMING.
1992 VIEW NORTH FROM EAST CRUDE ORE BIN TO CRUSHER ADDITION.
1992 VIEW NORTH OF UPPER LEVEL OF CRUSHER ADDITION. DINGS MAGNETIC PULLEY AT CENTER. ALSO SHOWS 100-TON CRUSHED UNOXIDIZED ORE BIN (RIGHT), PULLEY FORM 18 INCH BELT CONVEYOR CRUSHED OXIDIZED ORE BIN FEED AND STEPHENSADAMSON 25 TON/HR BUCKET ELEVATOR (UPPER CENTER). THE UPPER PORTION OF THE SAMPLING ELEVATOR IS ABOVE THE MAGNETIC PULLEY (CENTER LEFT) WITH THE ROUTE OF THE 16 INCH BELT CONVEYOR FINES FEED TO CRUSHED OXIDIZED ORE BIN TO ITS LEFT.
1992 VIEW OF SYMONS 3 BY 6 FEET VIBRATING SCREEN FROM NORTHWEST. SCREEN IS BELOW AND FED BY DINGS MAGNETIC PULLEY - DRIVE GEAR VISIBLE.