1992 PRIMARY CLASSIFIER No. 1 FROM EAST. PRIMARY MILL No. 2 IN BACKGROUND.
1992 VIEW OF MILLING FLOOR FROM SOUTHEAST. SECONDARY MILL AND CLASSIFIER AT MIDDLE LEFT. PRIMARY MILL SURGE TANK AND LAUNDERS AT MIDDLE BOTTOM. STAIR TO TROJAN CLASSIFIER LEVEL BEHIND CRANE BENT, UPPER RIGHT. PAIRED PIPES FROM PRIMARY PULP PUMPS TO PRIMARY THICKENERS RISE VERTICALLY AT MIDDLE RIGHT AND RUN HORIZONTALLY ACROSS TOP OF VIEW.
1992 VIEW FROM ABOVE OF PRIMARY MILL AND CLASSIFIER No. 2. PRIMARY CLASSIFIER No. 1 AT RIGHT EDGE OF VIEW.
1992 PRIMARY MILL AND CLASSIFIER No. 2 FROM NORTHWEST. MILL DISCHARGED INTO LAUNDER WHICH PIERCED THE SIDE OF THE CLASSIFIER PAN. WOOD LAUNDER WITHIN CLASSIFIER VISIBLE (FILLED WITH DEBRIS). HORIZONTAL WOOD PLANKING BEHIND MILL IS FEED BOX. MILL SOLUTION PIPING RUNS ALONG BASE OF WEST SIDE OF CLASSIFIER.
1992 VIEW OF MILL FLOOR FROM WEST. SECONDARY MILL IN LOWER CENTER; BARREN SOLUTION TANK AT MIDDLE RIGHT. PAIRED PIPES AT TOP OF VIEW RUN FROM PRIMARY PULP PUMPS ON LEFT TO PRIMARY THICKENERS ON RIGHT.
1992 SECONDARY MILL AND CLASSIFIER FROM NORTHWEST. WOOD FEED BOX BEHIND MILL, BARREN SOLUTION TANK BEHIND TRAVELING CRANE TRUSS AND ABOVE MILL.