Pictures 11 Bald Mountain Gold Mill, Lead South Dakota

Bald Mountain Gold Mill, Lead South Dakota 1992 VIEW OF ROASTER ADDITION FROM NORTH. ELEVATOR/ORE BIN ADDITION TO RIGHT (WEST) WITH BAKER COOLER IN FRONT.
1992 VIEW OF ROASTER ADDITION FROM NORTH. ELEVATOR/ORE BIN ADDITION TO RIGHT (WEST) WITH BAKER COOLER IN FRONT.

Bald Mountain Gold Mill, Lead South Dakota 1992 VIEW OF ROASTER ADDITION FROM NORTH. ELEVATOR/ORE BIN TOWER WAS FED BY THE 14 INCH BELT CONVEYOR SUPPORTED ON BENT, LOWER RIGHT. THE ROTATING BAKER COOLER IS SUPPORTED BY A CONCRETE FOUNDATION TROUGH.
1992 VIEW OF ROASTER ADDITION FROM NORTH. ELEVATOR/ORE BIN TOWER WAS FED BY THE 14 INCH BELT CONVEYOR SUPPORTED ON BENT, LOWER RIGHT. THE ROTATING BAKER COOLER IS SUPPORTED BY A CONCRETE FOUNDATION TROUGH.

Bald Mountain Gold Mill, Lead South Dakota 1992 ROASTER ADDITION INTERIOR FROM SOUTHWEST, VIEW OF RABBLE DRIVE SYSTEM.
1992 ROASTER ADDITION INTERIOR FROM SOUTHWEST, VIEW OF RABBLE DRIVE SYSTEM.

Bald Mountain Gold Mill, Lead South Dakota 1992 ROASTER ADDITION INTERIOR FROM EAST, VIEW OF DISCHARGE CREW DRIVE WITH GAS PIPING FOR HEARTH FIRING.
1992 ROASTER ADDITION INTERIOR FROM EAST, VIEW OF DISCHARGE CREW DRIVE WITH GAS PIPING FOR HEARTH FIRING.

Bald Mountain Gold Mill, Lead South Dakota 1992 ROASTER ADDITION INTERIOR, VIEW OF HEARTH DRIVE GEAR FROM NORTHEAST.
1992 ROASTER ADDITION INTERIOR, VIEW OF HEARTH DRIVE GEAR FROM NORTHEAST.

Bald Mountain Gold Mill, Lead South Dakota 1992 VIEW OF ROASTER ADDITION FROM WEST, LOCATION OF SYMONS 3 BY 8 FEET VIBRATING SCREEN. SHOWS BAKER COOLER WITH DUST COLLECTOR DUCT AND DISCHARGE CHUTE ON LEFT. THE 14 INCH BELT CONVEYOR WAS SUPPORTED ON TWO BENTS IN CENTER OF VIEW AS IT CONNECTED WITH THE BUCKET ELEVATOR/ORE BIN TOWER, WHICH IN TURN FED THE ROASTER (BEHIND). THE BASE OF THE ROASTER EXHAUST STACK IS AT THE UPPER RIGHT.
1992 VIEW OF ROASTER ADDITION FROM WEST, LOCATION OF SYMONS 3 BY 8 FEET VIBRATING SCREEN. SHOWS BAKER COOLER WITH DUST COLLECTOR DUCT AND DISCHARGE CHUTE ON LEFT. THE 14 INCH BELT CONVEYOR WAS SUPPORTED ON TWO BENTS IN CENTER OF VIEW AS IT CONNECTED WITH THE BUCKET ELEVATOR/ORE BIN TOWER, WHICH IN TURN FED THE ROASTER (BEHIND). THE BASE OF THE ROASTER EXHAUST STACK IS AT THE UPPER RIGHT.