Pictures 8 Shippingport Nuclear Power Station, Shippingport Pennsylvania
AUXILIARY CHAMBER, VIEW LOOKING WEST OF SUMP PUMP AND SCREEN (LOCATION CCC)
AUXILIARY CHAMBER BETWEEN CHAMBER AND CONCRETE ENCLOSURE (LOCATION CCC), LOOKING NORTHEAST SHOWING DRAIN PIPE FROM SUMP
AUXILIARY CHAMBER BETWEEN CHAMBER AND CONCRETE ENCLOSURE (LOCATION DDD), VIEW LOOKING EAST. LEAD ENCLOSED PIPING IS DRAIN FROM BOILER CHAMBER No. 1
AUXILIARY CHAMBER (EAST END), LOOKING NORTHWEST AT STEAM AND FEEDWATER PIPING AND PRESSURIZER AND FLASH/BLOWOFF TANK ROOMS (LOCATION EEE)
AUXILIARY CHAMBER, ELECTRICAL PENETRATION (LOCATION FFF), LOOKING NORTH
AUXILIARY CHAMBER (EAST END), VIEW LOOKING EAST SHOWING ELECTRICAL PENETRATION AND AIR LOCK (LOCATION GGG)