Do you have an update on the current status of this structure? Please tell us about it in the comments below.
ENLOE DAM UNDER CONSTRUCTION IN 1919, LOOKING NORTHWEST
ENLOE DAM (APPARENTLY COMPLETED), PENSTOCK UNDER CONSTRUCTION (LEFT, CENTER), AND THE ORIGINAL POWERHOUSE (RIGHT, CENTER). LOOKING NORTH
SITE AREA, SHOWING SECOND PENSTOCK UNDER CONSTRUCTION (LEFT, CENTER), DIVERSION HEADGATE AND REMAINS OF RAZED CONTROL POWERHOUSE (LOWER RIGHT), LOOKING NORTHWEST
COMPLETED DAM, SHOWING SPILLWAY GATES IN PLACE, LOOKING NORTHEAST. WASHINGTON WATER POWER HOUSES ARE IN REAR
RIGHT (WEST) ABUTMENT OF DAM, WITH FRAME STRUCTURE ATOP ABUTMENT, SPILLWAY GATES, AND PENSTOCKS, LOOKING NORTH
PENSTOCKS, SHOWING EQUIPMENT AND FOUNDATION OF RAZED POWERHOUSE (LEFT, CENTER), STRUCTURE ON EAST BANK AT FOOTBRIDGE LANDING (CENTER, BACKGROUND), AND SURGE TANKS (RIGHT, BACKGROUND), LOOKING SOUTHEAST