Pictures 3 Middle Creek Hydroelectric Dam, Selinsgrove Pennsylvania

WEST OF TURBINE PIT SHOWING PIT DRAINED AND TURBINE EXPOSED. ORIGINAL WATER LEVEL SHOWN BY LINE JUST ABOVE ARCHED OPENING TO LEFT. WATER LINE AFTER 1982 INSTALLATION OF FLASH BOARDS REVEALED BY DARK STAIN (1992)

SOUTHWEST OF TURBINE PIT SHOWING INTAKE GATE (IN CLOSED POSITION) (1992)

VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT TO RIGHT AND POWERHOUSE TO LEFT (1992)

NORTH ELEVATION OF POWERHOUSE, ALSO SHOWING PORTION OF DAM TO LEFT (1992)

EAST INTERIOR OF POWERHOUSE (1992)

NORTHWEST INTERIOR OF POWERHOUSE (1992)
