FOOTBRIDGE DECK, WITH STRUCTURE ON EAST BANK (LEFT, REAR), LOOKING NORTHEAST
FOOTBRIDGE, SHOWING ROCK CAIRN (RIGHT, FOREGROUND), POWERHOUSE AND SURGE TANKS (LEFT, CENTER), AND SPILLWAY (RIGHT, REAR), LOOKING NORTHWEST
SITE PLAN SHOWING ALL FEATURES, INCLUDING OPERATORS' HOUSES (SINCE RAZED), NORTHEAST OF DAM Vicinity map of the Okanogan Valley Power Company's facilities at Enloe Dam. Prepared by the Washington Water Power Company, September 15, 1924.
PLAN OF SPILLWAY AND LEFT (EAST) ABUTMENT, AND SECTION DRAWING OF DAM Plan and detail of dam, Drawing No. 101. Prepared by the Okanogan Valley Power Company, Spokane, Washington, July 31, 1919.
SECTION DRAWINGS OF HEADGATE IN RIGHT (WEST) ABUTMENT, SPILLWAY, AND PENSTOCK Sections and profiles of dam and pipe line, Exhibit J. Prepared by C. F. Uhden, electrical engineer, for the Okanogan Valley Power Company, 1916.
PLAN AND SECTION DRAWINGS OF SPILLWAY, HEADGATES AND MACHINERY, PENSTOCKS, SURGE TANKS, AND POWERHOUSE General plan and sections, Drawing F1709. Prepared by the Washington Water Power Company, April 23, 1924.