Fourth Street Church has served two congregations and survived a period as an auto body shop. After a 2019 windstorm brought down its roof and several walls, demolition threatened to end that history. Instead, local preservation work is rebuilding the stone church for another role: a gathering place for the wider Lampasas community.
The building at 811 East Fourth Street is modest in scale, but its history connects Hispanic Catholic and Black Methodist life in the city. Its reconstruction also raises a practical preservation question: how can a badly damaged building retain its identity while receiving the structural support needed for a new use?
St. Christopher's Catholic Church
Preservation Texas dates the church to the 1940s and identifies its founders as Mexican Catholics who were not permitted to attend services at St. Mary's, Lampasas' white Catholic church. They built St. Christopher's on the west bank of Sulphur Creek, establishing a place of worship within a segregated religious landscape.After St. Mary's integrated in the 1950s, the building was sold and used as an auto body shop. That commercial chapter separated its two periods of congregational use. By the time another religious community acquired it, the former church was vacant.
St. Paul's A.M.E. Church
In 1964, Lampasas' African Methodist Episcopal congregation purchased the property and renamed it St. Paul's A.M.E. Church. It became both a religious and social center for the Black community of East Lampasas.Preservation Texas places its closure around 2010, following population decline. The church subsequently joined the nearby Lampasas Colored School, New Hope Baptist Church and Hughes Mill and Dam ruins in the organization's 2023 Historic Resources of East Lampasas endangered-places listing. Together, those places preserve different aspects of the area's educational, religious and working life.
Stone Walls and a Mission-Inspired Front
The front gives the small building a distinctive presence. A curving parapet rises above an arched entrance, while the bell tower introduces a taller element at one side. Repeated arched openings carry the eye upward through the tower. These features give architectural form to the Spanish mission-style character identified in the restoration announcement.Jesús Najar's November 20, 2026 photographs show the reconstructed tower and front masonry clearly. The irregular stone faces, mortar joints and curved coping create a textured surface. Along the body of the building, a succession of rectangular window openings provides a simpler rhythm beneath the pitched roof.
The interior photographs reveal the relationship between the exterior and the main hall. Long masonry walls enclose an open volume beneath the rebuilt roof. At the entrance end, the large arch and smaller high opening remain legible from inside. The photographs record a construction stage, with scaffolding, exposed framing and unfinished surfaces still present.
The Storm and the Decision to Rebuild
The 2019 windstorm caused extensive structural loss. According to LCRA's restoration account, the roof and several walls collapsed, leaving the building vulnerable to demolition. Lampasas Heritage Foundation organized efforts to preserve the property and establish a different future for it.By March 2026, Preservation Texas was reporting that restoration was underway. Its newsletter described the church as approximately 1940 in date; the broader property history and LCRA account use the 1940s. An exact original completion year has not been established here.
A New Frame Within the Masonry
The state accessibility-project filing describes the intervention more precisely than the word restoration alone. Registered in July 2025 as St Christopher's Fourth Street Church Phase One, the project calls for a new steel frame, with existing masonry retained as veneer, reconstruction of the bell tower and a metal roof to match the earlier roof material. It also includes a new restroom and entry.The filing identifies JNW Architects LLC as the design firm and reports a project area of 2,184 square feet. Its $100,000 figure is an estimated cost for the registered scope, rather than a verified final bill for the entire preservation effort.
Najar's photographs show the new structural work inside the church: steel members beneath the metal roof, timber battens, exposed masonry and new partition framing. The building's architectural appearance and its means of support therefore need to be understood separately. Reconstruction is recovering recognizable forms while introducing a different structural system.
Preparing for Community Use
On November 20, 2026, LCRA and the City of Lampasas announced a $24,789 grant, accompanied by $52,140 in matching funds from Lampasas Heritage Foundation. The award supports completion of Phase I, including work on walls, windows, doors, the facade and bell tower, an accessible ramp, interior finishes and preparation for restrooms.The announced goal is a nonreligious community center for meetings, educational programs, cultural events and performances. The site lies beside the Sulphur Creek trail and within walking distance of downtown.
As of November 23, 2026, the grant announcement and recent photographs document work in progress. They do not establish that the center is finished or open. The project is giving a building shaped by separate communities another opportunity to bring people together, while retaining physical reminders of the congregations that made it significant.
Photographs of Fourth Street Church
Photographs 1-10 were taken by Jesús Najar on November 20, 2026. Photograph 11 was taken by Samantha Hunick in 2023. All are courtesy of Preservation Texas and used with permission.
Front elevation with reconstructed bell tower, curved parapet and arched entrance, November 20, 2026.
Bell tower and its stacked arched openings during reconstruction, November 20, 2026.
Bell tower, curved front parapet and entrance masonry, November 20, 2026.
Long side elevation with stone walls, window openings and new metal roof, November 20, 2026.
Interior under reconstruction, showing steel roof framing, timber battens and scaffolding, November 20, 2026.
Interior doorway and wall detail beneath the new roof structure, November 20, 2026.
Interior looking toward the far end of the hall, with new roof structure above, November 20, 2026.
Interior looking toward the arched main entrance, with new timber partition framing, November 20, 2026.
Rear interior area with masonry walls and unfinished service spaces, November 20, 2026.
Length of the interior hall during reconstruction, showing roof structure and window openings, November 20, 2026.
Front elevation with boarded entrance, vegetation and fencing, 2023.
Photographic documentation courtesy of Preservation Texas. Photographers: Jesús Najar and Samantha Hunick. Used with permission; no public-domain or Creative Commons license is claimed.
1940s origins, exclusion
from the white Catholic parish, intervening commercial use, 1964 A.M.E. purchase, approximate closure and 2023
endangered-places recognition. The NRHP/RTHL notation on this group page applies to the Colored School, not a verified
church designation. 2019 storm damage, foundation preservation work, mission-style character, funding,
Phase I tasks and proposed community use. 811 East Fourth
Street address, reconstruction scope, steel frame and retained masonry, project area, estimated cost and JNW Architects
LLC. Filed schedule dates are not evidence of actual completion. Contemporary report that the church was being restored by Lampasas Heritage
Foundation; approximate circa-1940 dating.Information sources (4)