PWR-2 CORE SUPPORT FLANGE BEING SEATED ON REACTOR VESSEL FLANGE, APRIL 14, 1964
LOWERING CLOSURE HEAD INTO REACTOR PIT, APRIL 20, 1964
PRESSURIZER AFTER PATCHWORK INSULATION, APRIL 21,1965
1-B MAIN COOLANT PUMP RIGGED FOR GAS PRESSURIZING, MAY 1, 1964
PWR-1 MAIN COOLANT PUMP (REMOVED), MAY 8, 1964
1-A STEAM DRUM THROUGH ACCESS OPENING, APRIL 24, 1964