Pictures 4 Quaker Oats Cereal Factory, Akron Ohio
(1979)
North side of the southern portion of the upper grain conveyor system on Elevator and Silo Complex B (1932) (1979)
Interior view of the Upper grain conveyor system enclosure for Elevator and Silo Complex B (1932) (1979)
Interior view of the duct work and mechanical equipment used in the delivery of the grain to the upper level grain conveyor system for Elevator and Silo Complex B (1932) (1979)
Interior view of the duct and delivery equipment situated in the upper grain conveyor structure of Elevator and Silo Complex B (1932) (1979)