Do you have an update on the current status of this structure? Please tell us about it in the comments below.
Interior of main entrance lobby, camera facing south (1993)
West staircase, south side of building (1993)
New biology lab, 2nd floor, showing built-in cabinets made by students (1993)
Classroom, showing working fireplace (1993)
Mathematics classroom with built-in desk and cabinets (1993)
Main entrance lobby showing marble wainscoting. Camera facing west (1993)